eOCULUS 01.09.07

School Buildings – The State of Affairs
A new architecture for a new education

List of Schools

Im Birch School, Zurich
K through Lower Secondary School (Ages 5-16)

Architects: Peter Maerkli, Zurich and Gody Kuehnis, Truebbach
Structural: Baenziger+Bacchetta+Fehlmann, Zurich
Landscape Architecture: Zulauf Seippel Schweingruber, Baden
Art: Hans Josephson
Architectural Competition 2000
Construction Period: 2002-2004
Number of Students: 780
Number of Classrooms: 36 and 3 Kindergarten.
Support Spaces: Multipurpose Competition Gym, Auditorium,
Cafeteria,
and Before and After School Program Space.
Gross Building Area: 184,642 SF; 237 SF/Student
Total Construction Cost including Soft cost, Site work,
Gen.Construction, Equipment, Fixtures, and Furniture:
$60,420,000; $328/SF.
General Construction Cost including Fees, Equipment,
Fixtures, and Furniture: $48,408,181; $262/SF.
Energy Consumption: 3.59 KW/SF; Energy Source: Municipal Utility.


Leutschenbach School, Zurich
K through Lower Secondary School (Ages 5-16).

Architect: Christian Kerez, Zurich
Structural: Dr. Joseph Schwartz, and Dobler, Schaellibaum and Partners
Landscape Architecture: 4d Landschaftsarchitekten, Bern
Architectural Competition 2003
Construction Period: 2005-2007
Number of Students: 440
Number of Classrooms: 22
Support Spaces: Double Gym, Cafeteria, Before and After School Program Space.
Gross Building Area: 90,424 SF; 206 SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $40,145,454; $444/SF.
General Construction Cost including Fees, Equipment, Fixtures, and Furniture: $26,713,636; $295/SF.
Energy Consumption: 3.39 KW/SF; Energy Source: Municipal Utility.


Albisriederplatz School, Zurich
Lower Level Secondary School (Ages 12-16)

Architect: bbesw architekten, Zurich
Structural: Aerni+Aerni AG, Zurich
Landscape Architect: Separate Project
Architectural Competition 2002
Construction Period: 2005-2007
Number of Students: 260
Number of Classrooms: 13
Support Spaces: Open Air Classrooms, Cafeteria, and Public Library. Gym facility under separate Project.
Gross Building Area: 64,189 GSF; 247 GSF/Student
Total Construction Cost including Soft cost, Gen. Construction, Equipment, Fixtures, and Furniture: $30,530,000; $476/SF.
General Construction Cost including Fees, Equipment, Fixtures, and Furniture: $20,622,727; $321/SF.
Energy Consumption: 4.12 KW/SF; Energy Source: Fumes Heat Recovery.


Allenmoos II School, Zurich
Special Education School (Ages 4-18)

Architects: Scheitlin-Syfrig and Partner Architekten AG, Lucerne
Structural: Desserich + Partners AG, Lucerne
Landscape Architect: Appert+Zwahlen, Lucerne
Architectural Competition 2000
Construction Period: Under Construction
Number of Students: 130
Number of Classrooms: 4 Kindergarten, 5 Special Ed. Rooms, 5 Small-Group Rooms.
Support Spaces: Before and After School Program Space with Kitchen, and Special Ed Center.
Gross Building Area: 53,243 SF; 410 SF/Student
Total Construction Cost including Soft cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $20,272,727; $381/SF.
General Construction Cost including Fees, Equipment, Fixtures, and Furniture: $13,090,909; $246/SF.
Power Factor per Minergy Standard: 3.66 KW/SF; Energy Source: Municipal Utility.


Extension Falletsche School, Zurich-Leimbach
Lower Level Secondary School (Ages 12-16)

Architect: Rolf Muehletaler, Bern
Structural: Stocker & Partners, Bern/Zurich
Landscape Architects: W+S Landschaftsarchitekt, Toni Weber, Solothurn
Architectural Competition 2002
Construction Period: 2004-2007
Number of Students: 180
Number of Classrooms: 9
Support Spaces: Public Library, Youth Center Space.
Gross Building Area: 52,861 SF; 294 SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $23,061,818; $436/SF.
General Construction Cost including Fees, Equipment, Fixtures, and Furniture incl.: $17168,18; $325/SF.
Energy Consumption: 3.3 KW/SF; Energy Source: Geothermal Heat Pump.


Extension Scherr School, Zurich
Primary School (Ages 7-12)

Architect: Patrick Gmuer Architekten AG, Zurich
Structural: Aerni+Aerni AG, Zurich
Landscape Architecture: Raderschall Landschaftsarchitekten AG, Meilen
Art: Peter Roesch, Lucerne
Planning and Design: 1997-1998
Construction Period: 2001-2003
Number of Students: 100
Number of Classrooms: 5
Support Spaces: Before and After School Program Space with Kitchen, and Student Lounge.
Gross Building Area: 29,853 SF; 299 SF/Student
Total Construction Cost including Soft cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $9,727,272; $326/SF.
General Construction Cost including Fees, Equipment, Fixtures, and Furniture: $7,830,909; $262/SF.
Energy Source: Natural Gas.


Extension Luchswiesen School, Zurich
Kindergarten and Primary School (Ages 5-12)

Architects: Covas Hunkeler Wyss, Architekten, Zurich
Structural:
Landscape Architecture: Rotzler Krebs, Partners, Winthertur
Architectural Competition: 2002
Construction Period: 2004-2006
Number of Students: 180
Number of Classrooms: 7 and 2 Kindergarten.
Support Spaces: Cafeteria, Before and After School Program Space, and StudentÕs Lounge.
Gross Building Area: 39,590 SF; 220 SF/Student
Total Construction Cost including Soft cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $17,190,909; $434/SF.
General Construction Cost including Fees, Equipment, Fixtures, and Furniture: $10,687,272; $270/SF.
Energy Source: Municipal Utility.


Extension and Renovation Bachtobel School, Zurich.
Primary School (Ages 7-12).

Architects: Marco Graber, Thomas Pulver Architects, Zurich and Bern.
Structural: Marchand & Partners AG, Bern
Landscape Architecture: Guido Hager, Zurich
Art: Istvan Balogh, Zurich
Architectural Competition: 1999
Construction Period: 2001-2002
Number of Students: 60
Number of Classrooms: 3
Support Spaces: Multi-Purpose Assembly Space, Before and After School Program Space with Kitchen, and Gym.
Gross Building Area: 25,091 SF; 418 SF/Student
Total Construction Cost including Soft cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $8,263,636; $329/SF.
General Construction Cost including Fees, Equipment, Fixtures, and Furniture: $6,468,181; $258/SF.
Energy Consumption Heat: 6.18 KW/SF; Energy Source: Natural Gas.


Extension and Renovation Lachenzelg School, Zurich
Lower Level Secondary School (Ages 12-16)

Architects: ADP Architekten AG, Zurich, Beat Jordi Caspar Angst.
Structural: Makiol and Wiederkehr, Beinwil am See
Landscape Architecture: Vetsch Nipkow & Partners, Zurich
Art: Kerim Seiler, Zurich
Planning and Design: 1998
Construction Period: 2001-2004
Number of Students: NA
Number of Classrooms: 3 Arts and Crafts Rooms, 3 Science Labs.
Support Spaces: Indoor/Outdoor Cafeteria, Auditorium, and Public Library.
Gross Building Area: 10,927 SF
Total Construction Cost including Soft cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $4,727,273; $433/SF.
General Construction Cost including Fees, Equipment, Fixtures, and Furniture $3,411,818; $312/SF.
Energy Source: Natural Gas.


Extension Kuegeliloo School, Zurich
Primary School (Ages 7-12)

Architects: Fosco Fosco — Oppenheim Vogt, Architects, Zurich.
Structural:
Landscape Architecture: berchtold, lenzin, Landschaftsarchitekten, Zurich
Art: Daniel Schibli, Andres Lutz + Anders Guggisberg
Planning and Design: 1998
Construction Period: 2001-2001
Number of Students: 120
Number of Classrooms: 6
Support Spaces: Before and After School Program Space with Kitchen.
Gross Building Area: 20,209 SF; 168 SF/Student
Total Construction Cost including Soft cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $6,238,182; $309/SF.
General Construction Cost: $5,105,455; $253/SF.
Energy Consumption: 2.57 KW/SF; Energy Source: Geothermal Heat Pump.


Extension Mattenhof School, Zurich
Primary School (Ages 7-12)

Architects: B.E.R.G. Architekten Gmbh, Zurich.
Structural: DSP Ingenieure und Planer AG, Greifensee
Landscape Architecture: Kuhn Truninger, Zurich
Competition: 2000
Construction Period: 2002-2003
Number of Students: 100
Number of Classrooms: 5
Support Spaces: Before and After School Program Space with Kitchen.
Gross Building Area: 17,252 SF; 173 SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $7,545,455; $437/SF.
General Construction Cost including Fees, Equipment and Fixtures: $5,036,364; $292/SF.
Energy Consumption: 4.08 KW/SF; Energy Source: Natural Gas.


In der Hoeh School, Volketswil (Zurich)
K through Lower Level Secondary School (Ages 5-15)

Architects: Gafner & Horisberger Architekten GmbH, Zurich.
Landscape Architecture: Guido Hager, Zurich
Competition: 2000
Construction Period: 2002-2003
Number of Students: 160
Number of Classrooms: 7 and 1 Kindergarten
Support Spaces: Multi_Purpose Assembly Space and Lunch Program Space
Gross Building Area: 41,199 SF; 258 SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $12,031,818; $292/SF.
General Construction Cost including Fees, Equipment and Fixtures: $9,563,636; $232/SF.
Energy Consumption: 3.41 KW/SF; Energy Source: Natural Gas.


Zurich International School, Waedenswil (CT. Zurich)
Private English Language Kindergarten and Primary School (Ages 5-11)

Client: International School, Waedenswil
Architects: Galli & Rudolf Architekten
Structural: Max Meyerhans AG, Wollerau
Landscape Architecture: Rotzler Krebs Partners, Winterthur
Competition: 1999
Construction Period: 2000-2002
Number of Students: 450
Number of Classrooms: 22 and 6 Kindergarten
Support Spaces: Reception Area, Parents Lounge, and Before and After School Program Space with Kitchen.
Gross Building Area: 62,859 SF; 140 SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture:
$17,952,000; $286/SF
General Construction Cost including Fees, Equipment and Fixtures: $14,116,363; $225/SF
Energy Consumption Heat: 5.26 KW/SF; Energy Source: Natural Gas.


Linden School, Niederhasli (CT. Zurich)
Primary School (Ages 7-12)

Architects: Buenzli & Curvoisier Architects, Zurich
Structural: Aerni + Aerni, Zurich
Landscape Architecture: Vogt Landschaftsarchiteketen AG, Zurich
Competition: 1999
Construction Period: 2001-2003
Number of Students: 120
Number of Classrooms: 6
Support Spaces: Gym, Lunch Program Space.
Gross Building Area: 25,110 SF; 209 SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture:
$11,360,000; $452/SF
General Construction Cost including Fees, Equipment and Fixtures: $7,754,545; $309/SF
Energy Source: Wood.


Thurzelg School, Oberbueren (CT. St. Gall)
Lower Level Secondary School (Ages 13-16)

Architects: Staufer & Hasler Architects, Frauenfeld and Zurich.
Structural: Wagner & Bruehwiler, Gossau and SJB, Herisau
Landscape Architecture: Ursula Weber, Oberbueren
Competition: 1999-2000
Construction Period: 2001-2002
Number of Students: 270
Number of Classrooms: 12
Support Spaces: Multi-Purpose Triple Gym, Auditorium, Administrative Spaces, TeacherÕs Lounge, and Library
Gross Building Area: 76,093 sf; 282 SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $22,543,636; $296/SF
General Construction Cost including Fees, Equipment and Fixtures: $16,309,090; $214/SF
Energy Consumption: 7.02 KW/SF; Energy Source: Natural Gas.


Volta School, Basel
Primary School (Ages 7-12)

Architects: Miller & Maranta Architects, Basel
Structural: Conzett Bronzini Gartmann AG, Chur
Landscape Architecture: August Kuenzel, Binningen
Art: Erik Steinbrecher, Berlin
Competition: 1996
Construction Period: 1998-2000
Number of Students: 240
Number of Classrooms: 12
Support Spaces: Double Gym, and Before and After School Program Space with Kitchen.
Gross Building Area: 63,686 SF; 265SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $16,837,272; $264/SF
General Construction Cost including Fees, Equipment and Fixtures: $12,393,636; $195/SF
Energy Source: Municipal Utility.


Buendtli School, Maienfeld (Ct. Grison)
Kindergarten and Lower Level Secondary School (Ages 5-6 and 13-15)

Architects: Pablo Horvath, Chur
Structural: Baenziger, Koeppel, Braendli Partners, Chur
Landscape Architecture: Lieni Wegelin, Malans
Contractor/Builder:
Competition: 2002
Construction Period: 2003
Number of Students: 90
Number of Classrooms: 3 and 3 Kindergarten
Support Spaces: Outside Kindergarten Space
Gross Building Area: 7,812 SF; 87 SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $2,196,783; $281/SF
General Construction Cost including Fees, Equipment and Fixtures: $1,623,188; $208/SF
Energy Source: Wood Chips.


Flims School, Flims (Ct. Grison)
Primary and Lower Level Secondary School (Ages 7-15)

Architects: Philip Weting, Martin Blatter Š Netzwerk Architektur, Zurich
Structural: Juerg Buchli, Haldenstein
Landscape Architecture:
Art: Anna-Rita Stoffel
Competition: 1999
Construction Period: 2001-2003
Number of Students: 320
Number of Classrooms: 16
Support Spaces: Multi-Purpose Gym, and Before and After School Program Space with Kitchen.
Gross Building Area: 74,530 sf; 233SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $16,664,533; $224/SF
General Construction Cost including Fees, Equipment and Fixtures: $14,101,875; $
Energy Source: Air-to Air Heat Pump.


Herti School, Zug
Lower Level Secondary School (Ages 12-16)

Architects: Enzmann + Fischer AG, Zurich
Structural:
Landscape Architecture:

Competition: 2002
Construction Period: ???
Number of Students: 360
Number of Classrooms: 18
Support Spaces: Multi-Purpose Gym, and Lunch Program Space.
Gross Building Area: 70,196; 195SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $23,590,909; $336/SF
General Construction Cost including Fees, Equipment and Fixtures: $18,195,454; $259/SF


Riedmatt School, Zug
Primary School (Ages 7-12)

Architects: Reinhard Naegele and Adria Twerenbold, Zurich
Structural: Berchtold and Eichner, Zug
Landscape Architecture: Rotzler Krebs Partners, Winterthur
Art: Nina Staehli, Cham:
Competition: 1995
Construction Period: 2000-2001
Number of Students: 120
Number of Classrooms: 6, Science Labs, and Small Group Spaces.
Support Spaces: Multi-Purpose Assembly Space, Library, Lunch Program Space.
Gross Building Area: 36,270; 302 SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $11,522,727; $318/SF
General Construction Cost including Fees, Equipment and Fixtures: $8,586,364; $237/SF
Energy Source: Natural Gas.


Les Ouches School, Geneva
Primary, Kindergarten, and Nursery School (Ages 0-11)

Architects: Andrea Bassi, Geneva
Structural: Amsler & Bombeli, Geneva
Landscape Architecture: La Touche Verte, Geneva
Competition: 2001
Construction Period: 2003-2005
Number of Students: 320 Age 7-11 and 80 Age 1-6.
Number of Classrooms: 16
Support Spaces: Cafeteria, Gym, Auditorium, and Municipal Offices.
Gross Building Area: 65,993; 165 SF/Student
Total Construction Cost including Soft Cost, Site Work, Gen. Construction, Equipment, Fixtures, and Furniture: $24,636,363; $373/SF
General Construction Cost including Fees, Equipment and Fixtures: $19,981,818; $303/SF
Energy Consumption: 5.1 KW/SF; Energy Source: Natural Gas.


De Eilanden School, Amsterdam (Netherlands)
Montessory Kindergarten and Primary School (Ages 4-12)

Architects: Architeccturstudio Herman Hertzberger, Amsterdam
Structural: Constuctiebureau Tentij
Landscape Architecture: Dienst Binnenstad, Amsterdam
Art: Akelei Hertzberger
Construction Period: 2001-2002
Number of Students: 300
Number of Classrooms: 11
Support Spaces: Multi-Purpose Assembly Space..
Gross Building Area: 12,397 SF; 41 SF/Student
Total Construction Cost: $1,457,768; $118/SF
Energy Source: Natural Gas.


Voorn School, Utrecht (Netherlands)
Primary, Kindergarten, and Nursery School (Ages 0-12)

Architects: Frencken Scholl Architecten, Maastricht
Structural: Adviesbureau Brekelmans
Landscape Architecture: Ingenieursbureau, Utrecht
Art: Marin Kasimir
Contractor/Builder:
Construction Period: 2000-2001
Number of Students: 900
Number of Classrooms: 32
Support Spaces: Multi-Purpose Auditorium, Double Gym, School and Civic Offices, Recreational Space.
Gross Building Area: 62,403 SF; 69 SF/Student
Total Construction Cost: $7,403,420; $119/SF
Power Factor Heat: 13.44 KW/SF; Energy Source: Municipal Utility.


Heimdalsgade School, Copenhagen (Denmark)
Lower Secondary School (Ages 13-16)

Architects: Kant Arkitekter A/S, Copenhagan
Structural: RIA, Radgivende Ingenorer og arkitektant
Construction Period: 2000-2001
Number of Students: 300
Number of Classrooms: 5
Support Spaces: Library, Cafeteria, Large-Group Spaces and Theme Areas in Lieu of Class Rooms.
Gross Building Area: 43,450 SF; 145 SF/Student
Total Construction Cost: $10,172,060; $234/SF


Hellerup School, Gentofte (Denmark)
Primary and Lower Secondary School (Ages 6-16)

Architects: Arkitema A/S, Arhus
Structural: Soren Jensen
Landscape Architecture: Arkitema A/S, Arhus
Competition: 2000
Construction Period: 2000-2002
Number of Students: 750
Number of Classrooms: 30
Support Spaces: Triple Multi-Purpose Gym,, Library, Cafeteria, Music and Recreation Spaces.
Gross Building Area: 76,260 SF; 102 SF/Student
Total Construction Cost: $15,163,000; $199/SF
Energy Source: District Heating.


Bakkelokka School , Nessoden (Norway)
Lower Level Secondary School (Ages 13-16)

Architects: NAV AS Arkiteker, Oslo
Structural: Dr. techn. Olav Olson AS
Landscape Architecture: Ostengen & Bergo AS
Art: V. Bbjerkeseth Andresen, Kaj Hjelseth, Jon Gundersen.
Competition: 2000
Construction Period: 2001-2002
Number of Students: 270
Number of Classrooms: 9
Support Spaces: Civic Offices, Administration Spaces, Library, Double Gym, Student Lounges, and Cafeteria.
Gross Building Area: 58,869 SF; 218 SF/Student
Total Construction Cost: $15,580,625; $265/SF
Energy Source: Oil and Electricity.


Eco School, Maeder (Austria)
Lower Level Secondary School (Ages 11-15)

Architects: Baumschlager & Eberle, Lochau
Structural: Ruesch, Diem + Partner, Dornbirn
Mechanical: GMI Gasser & Messner Ingeneers, Dornbirn
Landscape Architecture: Vogt Landschaftsarchiteketen AG, Zurich
Competition: 1992
Construction Period: 1996-1998
Number of Students: 200
Number of Classrooms: 8
Support Spaces: Cafeteria, Lab Spaces, Double Multi-Purpose Gym.
Gross Building Area: 55,242 SF; 276 SF/Student
Total Construction Cost: $8,224,000; $149/SF
General Construction Cost: $6,296,500; $114/SF
Energy Consumption: 1.93 KW/SF Energy Source: Bio Mass.


Extension Karviaistie School, Malmi (Finland)
Primary and Lower Secondary Special Ed School (Ages 7-16)

Architects: Kirsti Siven & Asko takala Arkkitehdit Oy, Helsinki
Structural: Insinooritoimisto Pertti Ranta Oy, Helsinki
Landscape Architecture: Architects + Maisema-arkkitehdit Byman & Ruokonen
Art: Tarja Pitkaenen-Walters, Helsinki
Competition: 2000
Construction Period: 2000-2001
Number of Students: 70
Number of Classrooms: 7
Support Spaces: Combined Multi-Purpose Gym/Auditorium, Administration, Arts and Crafts Spaces, Cafeteria.
Gross Building Area: 19,865 SF; 284 SF/Student
Total Construction Cost: $5,641,150; $284/SF
Energy Source: Municipal Utility (Gas).


Aurinkolahti School, Yuosaari (Finland)
Primary and Lower Secondary School (Ages 9-15)

Architects: Jeskanen-Repo-Teranne Arkkitehdit Oy & Arkkitehtitoimisto Leena Yli-Lonttinen
Structural: Insinooritoimisto Oy Matti Ollila & Co / Kari Lemettinen
Interior Design: Pasi Haemaelaeinen, Martti Lukander.
Art: Veikko Bjoerk, Tuelay Schakir.
Competition: 1998
Construction Period: 2001-2002
Number of Students: 540
Number of Classrooms: 22 and 3 Small-Group Spaces.
Support Spaces: Combined Cafeteria/Auditorium, Gym, and Arts and Crafts Spaces.
Gross Building Area: 59,241 SF; 110 SF/Student
Total Construction Cost: $17,219,000; $291/SF
General Construction Cost: $12,336,000; $208/SF
Energy Consumption: 3.88 KW/SF Energy Source: Municipal Utility.


Hahnenkamm School, Alzenau (Germany)
Primary and Lower Secondary Special Education School (Ages 6-16)

Architects: (se) arch, Stephan Eberding, Stephani Eberding, Stuttgart
Structural: Pfefferkorn+Partners
Landscape Architecture: (se) arch with welsner,welsner, Nuertingen
Competition: 1997
Construction Period: 2000-2003
Number of Students: 270
Number of Classrooms: 18
Support Spaces: Arts and Crafts Spaces, Administration, TeacherÕs and Student Lounges, and Assembly Area
Gross Building Area: 41,392 SF; 153 SF/Student
Total Construction Cost: $13,492,500; $326/SF
General Construction Cost: $7,067,500; $171
Energy Source: Bio Mass.


Egg Evangelical School, Gelsenkirchen-Bismark (Germany)
Primary, Lower and Upper Secondary School (Ages 11-18)

Client: The Evangelical Church of the State of Nordrhein-Westfalen.
Architects: Plus+ Bauplanung GmbH, Peter Huebner, Neckartenzlingen
Structural: Weischede,Herrmann and Partners GmbH.
Landscape Architecture: Christoph Harms
Contractor/Builder:
Competition: 1993
Construction Period: 1997-2004
Number of Students: 900
Number of Classrooms: 30
Support Spaces: Gym, Cafeteria, Multi-Purpose Auditorium, Public Library, and Administration.
Gross Building Area: 153,450 SF; 170SF/Student
Total Construction Cost: $29,565,280; $193/SF
General Construction Cost: $23,299,620; $152/SF
Energy Source: Municipal Utility.